datetime_now =2024-05-16T21:09:32
datetime_class =2024-05-17T00:00:00
datetime_diff =85881600
MBB Consulting™ - Lean Lego Game In Oklahoma City, OK

Lean Lego Game In Oklahoma City, OK

Lean Lego Game
Oklahoma City is Oklahoma's capital and largest city. Lean key Lean Manufacturing concepts in a playful setting building Lego houses.
Price $349
Duration 1 day
Format In-person, instructor-led slideshow with exercises and a quiz to test comprehension.
Materials Each student will receive a 3-ring binder containing print-outs of the slideshow. Assuming satisfactory quiz results graded a few days after class, each student will receive a Certificate of Completion.
Class Size5 - 10 students
Start Day Options
SUMOTUWETHFRSA
Legend:
unavailable
available
facility match
CityOklahoma City, OK

Recommended Dates

The following dates are recommended because they have a low minimum student requirement, or students are enrolled but not yet enough to hold a class. Please choose a date for your Lean Lego Game class. Dates are formatted as year-month-day:


All Dates

If none of the recommended dates work with your schedule, that's ok. Please choose a date from the list below:



About Lean Lego Game


Who is Lean Lego Game for?

Since we all deal with and use processes in some form both at work and home, Lean Manufacturing training is useful for everybody. Yet, its usually taken by Oklahoma City students working in manufacturing or service provision. In our course, Oklahoma City students learn:

Lean Lego Game Course Overview:

Rather than death by PowerPoint, experience waste, push vs. pull processes, kanban, kaizen, systems thinking, and work cells in a fun exercise. This workshop is intended for students fairly early in their Lean journey but can be a fun refresher for more advanced practitioners. It can be run in either a short or longer session which never goes past half-day. A typical day looks like this:

IterationDescriptionDuration (min)
Introduction20
1Build Houses using a push system10
Retrospective focused on families of waste, push vs. pull, and kanban20
2Build Houses10
Retrospective focused on level-loading, systems thinking, and work cells20
3Build Houses10
Retrospective focused on kaizen20
4Build Houses10
Retrospective20
Conclusion20
Total160


A short session uses three iterations. A longer session uses all four.

Prerequisites. None

Oklahoma City

Cinderella City - The Big Friendly

Excellent choice! Nicely situated on the Oklahoma River and Route 66, the city has become known for oil. Even the capital building sits on an active oil well. Tornadoes are common, And, it is said that onion burgers were invented here. After Lean Lego Game, head down to Bricktown. Or, visit the National Cowboy & Western Heritage Museum, zoo, botanical gardens, or science museum.

Oklahoma City
SUMOTUWETHFRSA
Oklahoma City, OK
Credit: Urbanative

Facility

If your class is longer than a day and you wish to stay on-site, contemporary-styled rooms offer free WiFi, desks, flat-screen TVs with premium cable channels and coffeemakers. Suites add separate living areas and minifridges. Social spaces include a living room-style lobby and an outdoor courtyard. The American restaurant serves breakfast and dinner. There's also a business center with workstations and printers, and 10 meeting rooms. Other amenities include an indoor pool, a whirlpool, an exercise room.

Location:

Adjacent to the Chesapeake Energy Arena making it easy to combine your Lean Lego Game class with a Thunder game.
A 5-minute walk from the Bricktown Riverwalk.
Just down the road from Myriad Botanical Gardens.

Testimonials

Read what our students and clients have to say.

Steven B.
Steven B.
Electrical Supervisor
Machinery


(Our Instructor) Jake was very informative and knowledgeable in the 5S area. He was able to answer everyone's questions. Jake involved the class to help everyone understand the material.



Srinivas Hatathodi
Srinivas Hatathodi
Owner / Consultant
Lake City Consulting


Our Master Black Belt Instructor was instrumental in getting my department to change the way we think. Achieving success in Lean methods sometimes needs an overhaul of conventional methods and our MBB was the person that can take the concept from an abstract form to reality in the most efficient way possible. The Lean Six Sigma projects that our department conducted helped us reduce costs and streamline our operations.